





OUR WORK IN THE WASATCH BACK
Photographic documentation of natural boulder revetments, hand-stacked river stone, and hydro-seeded stream channels.


CASE STUDY
Protecting a 40-Acre Heber Valley Estate
During record spring runoff, our team engineered and installed a comprehensive native boulder riprap system, seamlessly integrating with the existing alpine landscape to prevent severe erosion and preserve property value.
The project involved precise heavy machinery operation and hand-stacked river stone work, ensuring both structural integrity and estate-grade aesthetics, built to withstand future 100-year high-water events.
Ready to secure your alpine property?
Schedule a site assessment to discuss your specific riverbank stabilization or land management needs.